1. Install and test the management subsystem. The management subsystem can monitor and manage the entire integrated wiring system in real time to improve the reliability and efficiency of network communication. Security subsystem Security subsystem refers to the system that protects the entire integrated wiring system.
2. Trunk subsystem: The trunk subsystem should be composed of trunk cables and optical cables from the equipment room to the telecommunications room, the building wiring equipment (BD) installed between the equipment and the equipment cables and jumpers.
3. Working area (terminal) subSystem: It is composed of the connection of the soft cable of the information socket and the terminal equipment, including assembly, connection and expansion of the soft cable, and them are built between the input and output sockets and the equipment terminals. Among them, the information socket is divided into wall, floor, table and soft base type.
The scope of the six major subsystems of integrated wiring and their functions: the work area subsystem is an independent area that needs to set up the terminal, that is, a work area. The work area subsystem should be composed of the information socket of the wiring (horizontal) wiring system, connecting cables and adapters extending to the workstation terminal equipment. .
[Answer]: B There are six subsystems in the structured integrated cabling system, which are: work area subsystem: the purpose is to realize the connection between the work area terminal equipment and the horizontal subsystem, which is composed of cables connected to the terminal equipment to the information socket.
The integrated wiring system includes the following six subsystems: the work area subsystem. Horizontal subsystem. Manage the subsystem. Vertical trunk subsystem. Equipment room subsystem. Subsystem of the building complex.
According to the requirements of the entire integrated wiring system, the horizontal subsystem should be connected to the wiring equipment of the secondary handover room, handover room or equipment room to form a telephone, data, TV system and monitoring system, and facilitate management.
Connect the horizontal wiring subsystem and vertical trunk cable of each floor, and be responsible for connecting and controlling other subsystems. It is composed of cross-connection, interconnection and I/O equipment, which can locate communication lines and facilitate the management of communication lines.
The integrated wiring system is usually composed of six parts: the working area subsystem, the horizontal subsystem, the trunk subsystem, the equipment room subsystem, the management subsystem and the building complex trunk subsystem.
The reality of each subsystemThe current functions are as follows: The workspace subsystem consists of a connection cable and adapter extending the information socket of the wiring (horizontal) wiring system to the workstation terminal equipment. Each workspace is set up with a telephone interface and 1 to 2 computer terminal interfaces according to user requirements.
According to the structural characteristics of the building, the best wiring scheme will be adopted.
's needs. The laying methods adopted by the wiring subsystem of the building complex mainly include overhead wiring, lane wiring, direct buried wiring, underground pipeline wiring, or any combination of these four laying methods. Among them, the laying method of underground pipe wiring can provide the best mechanical protection for the cable, which is the most ideal way.Therefore, choose option C.
Only connect to the information socket management room. In the integrated wiring system, the horizontal trunk subsystem consists of 4 pairs of UTP (unshielded twisted pair), which can support most modern communication equipment. If there is magnetic field interference or information retention, the twisted pair can be shielded. If high-bandwidth applications are required, optical cables can be used.
Direct buried pipe type. First, go through the inner line groove of the ceiling, and then go through the branch pipe to the information exit.
After the underground pipe groove system is built at the same time as the building, its routing and location generally cannot be changed. Therefore, when designing, the pipe groove system should have a certain degree of flexibility.
The horizontal subsystem The wiring pipe of the horizontal subsystem consists of two parts: one part is the bus channel where the horizontal transmission medium is placed on each floor, and the other part is the branch pipe or wire channel that leads the transmission medium to the information interface of each room. A transitional connection is required from the bus channel to the branch channel or pipe.
The wiring distance of the building complex subsystem is mainly determined by the distance between the two buildings. Generally, 1M of cable is reserved in each outdoor wiring well. There are four types of cable laying methods for building subsystems: overhead wiring method, direct buried wiring method, underground pipeline wiring method and tunnel cable wiring method.
In the building complex pipeline system, the average spacing of the junction well is about 180m, or the junction well is set at the main junction point. The junction well can be prefabricated or on-site pouring. Which kind of junction well should be indicated in the structural scheme.
If it is the introduction method of underground pipelines (including the introduction method of direct buried cables or direct buried optical cables through steel pipes), it is because the introduction pipeline passes through the main body or load-bearing structure of the building. To this end, in the engineering design and construction of the integrated wiring system, it is necessary to closely contact with the housing architectural design and construction units to cooperate with the negotiation to solve the following problems.
Sourcing intelligence platforms-APP, download it now, new users will receive a novice gift pack.
1. Install and test the management subsystem. The management subsystem can monitor and manage the entire integrated wiring system in real time to improve the reliability and efficiency of network communication. Security subsystem Security subsystem refers to the system that protects the entire integrated wiring system.
2. Trunk subsystem: The trunk subsystem should be composed of trunk cables and optical cables from the equipment room to the telecommunications room, the building wiring equipment (BD) installed between the equipment and the equipment cables and jumpers.
3. Working area (terminal) subSystem: It is composed of the connection of the soft cable of the information socket and the terminal equipment, including assembly, connection and expansion of the soft cable, and them are built between the input and output sockets and the equipment terminals. Among them, the information socket is divided into wall, floor, table and soft base type.
The scope of the six major subsystems of integrated wiring and their functions: the work area subsystem is an independent area that needs to set up the terminal, that is, a work area. The work area subsystem should be composed of the information socket of the wiring (horizontal) wiring system, connecting cables and adapters extending to the workstation terminal equipment. .
[Answer]: B There are six subsystems in the structured integrated cabling system, which are: work area subsystem: the purpose is to realize the connection between the work area terminal equipment and the horizontal subsystem, which is composed of cables connected to the terminal equipment to the information socket.
The integrated wiring system includes the following six subsystems: the work area subsystem. Horizontal subsystem. Manage the subsystem. Vertical trunk subsystem. Equipment room subsystem. Subsystem of the building complex.
According to the requirements of the entire integrated wiring system, the horizontal subsystem should be connected to the wiring equipment of the secondary handover room, handover room or equipment room to form a telephone, data, TV system and monitoring system, and facilitate management.
Connect the horizontal wiring subsystem and vertical trunk cable of each floor, and be responsible for connecting and controlling other subsystems. It is composed of cross-connection, interconnection and I/O equipment, which can locate communication lines and facilitate the management of communication lines.
The integrated wiring system is usually composed of six parts: the working area subsystem, the horizontal subsystem, the trunk subsystem, the equipment room subsystem, the management subsystem and the building complex trunk subsystem.
The reality of each subsystemThe current functions are as follows: The workspace subsystem consists of a connection cable and adapter extending the information socket of the wiring (horizontal) wiring system to the workstation terminal equipment. Each workspace is set up with a telephone interface and 1 to 2 computer terminal interfaces according to user requirements.
According to the structural characteristics of the building, the best wiring scheme will be adopted.
's needs. The laying methods adopted by the wiring subsystem of the building complex mainly include overhead wiring, lane wiring, direct buried wiring, underground pipeline wiring, or any combination of these four laying methods. Among them, the laying method of underground pipe wiring can provide the best mechanical protection for the cable, which is the most ideal way.Therefore, choose option C.
Only connect to the information socket management room. In the integrated wiring system, the horizontal trunk subsystem consists of 4 pairs of UTP (unshielded twisted pair), which can support most modern communication equipment. If there is magnetic field interference or information retention, the twisted pair can be shielded. If high-bandwidth applications are required, optical cables can be used.
Direct buried pipe type. First, go through the inner line groove of the ceiling, and then go through the branch pipe to the information exit.
After the underground pipe groove system is built at the same time as the building, its routing and location generally cannot be changed. Therefore, when designing, the pipe groove system should have a certain degree of flexibility.
The horizontal subsystem The wiring pipe of the horizontal subsystem consists of two parts: one part is the bus channel where the horizontal transmission medium is placed on each floor, and the other part is the branch pipe or wire channel that leads the transmission medium to the information interface of each room. A transitional connection is required from the bus channel to the branch channel or pipe.
The wiring distance of the building complex subsystem is mainly determined by the distance between the two buildings. Generally, 1M of cable is reserved in each outdoor wiring well. There are four types of cable laying methods for building subsystems: overhead wiring method, direct buried wiring method, underground pipeline wiring method and tunnel cable wiring method.
In the building complex pipeline system, the average spacing of the junction well is about 180m, or the junction well is set at the main junction point. The junction well can be prefabricated or on-site pouring. Which kind of junction well should be indicated in the structural scheme.
If it is the introduction method of underground pipelines (including the introduction method of direct buried cables or direct buried optical cables through steel pipes), it is because the introduction pipeline passes through the main body or load-bearing structure of the building. To this end, in the engineering design and construction of the integrated wiring system, it is necessary to closely contact with the housing architectural design and construction units to cooperate with the negotiation to solve the following problems.
How to secure competitive freight rates
author: 2024-12-24 02:30HS code-based supply risk mitigation
author: 2024-12-24 01:44Best trade data solutions for startups
author: 2024-12-24 00:54How to analyze trade seasonality
author: 2024-12-24 00:26Global trade compliance playbooks
author: 2024-12-24 00:18How to leverage big data in trade
author: 2024-12-24 02:40HS code-based negotiation with customs
author: 2024-12-24 01:54Advanced tariff classification tools
author: 2024-12-24 01:50Chemical industry HS code search
author: 2024-12-24 01:15Real-time container throughput data
author: 2024-12-24 01:01134.51MB
Check874.74MB
Check435.43MB
Check794.35MB
Check756.17MB
Check998.19MB
Check637.39MB
Check247.57MB
Check738.55MB
Check723.84MB
Check161.43MB
Check343.26MB
Check938.74MB
Check482.45MB
Check489.12MB
Check293.82MB
Check238.49MB
Check357.74MB
Check582.13MB
Check833.78MB
Check595.71MB
Check284.26MB
Check963.93MB
Check242.17MB
Check721.64MB
Check532.78MB
Check289.77MB
Check689.35MB
Check183.26MB
Check879.45MB
Check351.98MB
Check612.81MB
Check637.11MB
Check834.58MB
Check588.43MB
Check866.34MB
CheckScan to install
Sourcing intelligence platforms to discover more
Netizen comments More
103 USA trade data analysis
2024-12-24 02:41 recommend
2042 Analytical tools for trade diversification
2024-12-24 02:11 recommend
2566 How to use trade data for pricing strategy
2024-12-24 01:58 recommend
1655 Global trade customs valuation analysis
2024-12-24 01:34 recommend
2075 APAC trade flows by HS code
2024-12-24 01:11 recommend