Sixth: If there is a pipe on the ground, it should be protected immediately to prevent it from stepping and cracking, which will affect future maintenance. Seventh: When the wiring length is more than 15m or there are 3 bends in the middle, a junction box should be installed in the middle, because when disassembling and installing the wire, it is too long or more curved, and the wire cannot pass through the wire pipe.
How to wire comprehensive wiring for home decoration. Before wiring, we should consider the overall design, the layout of each socket and the placement of various household appliances. At the same time, we also need to comprehensively consider the layout of telephone lines, cable TV cables, power lines and twisted pair cables.
If the home decoration budget is not enough, when purchasing the home comprehensive wiring management system, you can install a standard first.Quasi-type "smart home junction box", and plan and lay enough lines to establish a basic smart home wiring system, so that it can not only be used immediately, but also conveniently replace and configure more powerful intelligent junction boxes in the future.
How to carry out integrated wiring design: first determine the needs of the user. Determine whether the comprehensive wiring should be done in 6 areas (working area, horizontal area, vertical trunk area, management area, equipment area, construction area) or 5 areas (working area, horizontal area, vertical trunk area, management area, equipment area) according to the requirements.
Indoor circuit wiring principle: material selection If you decorate an old house, the original aluminum wire must be replaced with copper wire, because aluminum wire is extremely easy to oxidize and its joints are easy to ignite. According to the survey, the incidence of electrical fires using aluminum wire is dozens of times that of copper wire.
When wiring, strong current and weak current lines should be separated to prevent interference, and when wiring comprehensively in the building, strong current and weak current should go through their respective wire grooves, which is a requirement of electrical construction specifications. Of course, there is no such strict requirement for home decoration, but it is still very important to isolate strong and weak currents from each other. It is necessary.
When connecting the data cable to the computer room, it is appropriate to choose different parts of the cable or trunk cable to meet the needs of different routing voice and data respectively. When necessary, the optical cable system can also be used to meet the requirements.
Design the structure of the integrated wiring system.The design layout is made by. Argument the feasibility of the draft design plan. Draw a construction drawing of integrated wiring. Compile a list of comprehensive wiring materials. After the comprehensive wiring design scheme is formulated, it can be submitted to Party A for review. After approval, the comprehensive wiring construction can begin.
Horizontal wiring subsystem: weak current wells on each floor are also used as floor equipment rooms. From the equipment room to the working area information socket, 6 types of 4-pair 8-core UTP twisted pair wires are adopted, and the length of the wiring cable does not exceed 90 meters.
How to carry out integrated wiring design: first determine the needs of the user. Determine whether the comprehensive wiring should be done in 6 areas (working area, horizontal area, vertical trunk area, management area, equipment area, construction area) or 5 areas (working area, horizontal area, vertical trunk area, management area, equipment area) according to the requirements.
Engineering drawings generally use AutoCAD, Zhongwang CAD, Haochen CAD, Caxa, UG and other software. Among them, the most widely used is Aut.oCAD, mainly used for two-dimensional drawing, detailed drawing and design documents, has now become an internationally popular drawing tool.
Let me recommend one to you. There is a tool called visio in office2003, which is used for drawing vector diagrams. It is often used to draw two-dimensional floor plans, such as layout diagrams, top views, floor plans, connection diagrams, geolocation diagrams and flowcharts.
Download Baidu Know APP and experience it. Use Baidu Know APP to experience it immediately. There may be answers that others want to know in the lens of your mobile phone.
Connect the vertical trunk cable to the horizontal wiring subsystem of each floor. The equipment room subsystem connects various public equipment (such as computer hosts, digital program-controlled switches, various control systems, network interconnection equipment) to the main wiring rack.
Draw a comprehensive wiring diagram with visio: open the network diagram; on the "View" menu, click "Shape Data Window"; click the shape you want to add data; in the "Shape Data" window, select a data domain, and then type data for the domain; to move to the next attribute in the list, please Press the Enter key.
1. Ensure the integrity of the fire alarm system. Note: All control and signal cables in this system should use twisted pair shielded cables. This cable is a weak current cable and cannot be laid together with the solenoid valve power line. When laying with a wire groove, a separate wire groove must be used.
2. FromThe water cannon needs to put a 6-core cable and a 2-core video cable to the control box. From the central control room to the control box, a 6-core cable should be laid (2-core power cable 220v, 2-core signal cable, 2-core 24V power cable, and some controllers are 220v). That should be all.
3. The second-generation intelligent fire water cannon of Lianzong Fire Technology has also developed a remote control mode. In this mode, the operator can directly adjust the fire water cannon mouth up and down, left and right according to the symbols marked on the remote control to carry out the fire extinguishing procedure.
4. Water cannon to fire alarm host: SYV-75-5 (video cable). ( When the water cannon does not have video, there is no need to set up video and remote control lines, and the system does not have remote control function) (6) Fire alarm host to the pump room: RVV4x5 (start pump line, start pump feedback line).
5. Intelligent firefighters are not afraid of the operation method of the linkage control host. For military patrol shops, the linkage host can operate each water cannon, and each water cannon has a unique address in the linkage host. If you select the corresponding address, you can accurately operate each water cannon.
1. Draw a comprehensive wiring diagram with visio: open the network diagram; on the "View" menu, click "Shape Data Window"; click the shape you want to add data; in the "Shape Data" window, select a data domain, and then type the data for the domain; move to the next genus in the list Sex, please press Enter.
2. Open the Visio software.Click "File" - "New" - "Flowchart" and select "Basic Flowchart". Draw the process node. Drag the "shape" required for drawing the flowchart to the drawing area. Draw the process line. Select "Connection Cable Tool" to draw the connection. Identify the direction of the process.
3. The system diagram should be arranged according to the information points of each floor, and the management room of each building should be ten floors per seven floors. The comprehensive wiring of housing comprehensive design and wiring of each floor of the building construction drawing or system plan to understand the separate comprehensive wiring drawing.
4. In the blank space or folder on the desktop, click the right mouse button, and then select the new VISIO drawing. After creating a new one, we can modify the name, and then double-click the newly created document to open it. IT CAN BE SEEN THAT VISIO SOFTWARE PROVIDES A LOT OF TEMPLATES. WE CAN CHOOSE THE APPROPRIATE TEMPLATE ACCORDING TO OUR NEEDS, AND THEN CLICK THE CREATE BUTTON.
5. Next, we adjust the thickness of the lines, select all with ctrl+A, find the tool to adjust the thin bar in the toolbar above the workspace, and select the size that suits you. Such a basic organizational chart has been established.
6. Open the Visio software and import the image material. Click the picture, and then click the width and height in the lower left corner to pop up the size and position dialog box. Set the width and height. Accurately adjust the spacing of the pictures.
HS code-based forecasting for raw materials-APP, download it now, new users will receive a novice gift pack.
Sixth: If there is a pipe on the ground, it should be protected immediately to prevent it from stepping and cracking, which will affect future maintenance. Seventh: When the wiring length is more than 15m or there are 3 bends in the middle, a junction box should be installed in the middle, because when disassembling and installing the wire, it is too long or more curved, and the wire cannot pass through the wire pipe.
How to wire comprehensive wiring for home decoration. Before wiring, we should consider the overall design, the layout of each socket and the placement of various household appliances. At the same time, we also need to comprehensively consider the layout of telephone lines, cable TV cables, power lines and twisted pair cables.
If the home decoration budget is not enough, when purchasing the home comprehensive wiring management system, you can install a standard first.Quasi-type "smart home junction box", and plan and lay enough lines to establish a basic smart home wiring system, so that it can not only be used immediately, but also conveniently replace and configure more powerful intelligent junction boxes in the future.
How to carry out integrated wiring design: first determine the needs of the user. Determine whether the comprehensive wiring should be done in 6 areas (working area, horizontal area, vertical trunk area, management area, equipment area, construction area) or 5 areas (working area, horizontal area, vertical trunk area, management area, equipment area) according to the requirements.
Indoor circuit wiring principle: material selection If you decorate an old house, the original aluminum wire must be replaced with copper wire, because aluminum wire is extremely easy to oxidize and its joints are easy to ignite. According to the survey, the incidence of electrical fires using aluminum wire is dozens of times that of copper wire.
When wiring, strong current and weak current lines should be separated to prevent interference, and when wiring comprehensively in the building, strong current and weak current should go through their respective wire grooves, which is a requirement of electrical construction specifications. Of course, there is no such strict requirement for home decoration, but it is still very important to isolate strong and weak currents from each other. It is necessary.
When connecting the data cable to the computer room, it is appropriate to choose different parts of the cable or trunk cable to meet the needs of different routing voice and data respectively. When necessary, the optical cable system can also be used to meet the requirements.
Design the structure of the integrated wiring system.The design layout is made by. Argument the feasibility of the draft design plan. Draw a construction drawing of integrated wiring. Compile a list of comprehensive wiring materials. After the comprehensive wiring design scheme is formulated, it can be submitted to Party A for review. After approval, the comprehensive wiring construction can begin.
Horizontal wiring subsystem: weak current wells on each floor are also used as floor equipment rooms. From the equipment room to the working area information socket, 6 types of 4-pair 8-core UTP twisted pair wires are adopted, and the length of the wiring cable does not exceed 90 meters.
How to carry out integrated wiring design: first determine the needs of the user. Determine whether the comprehensive wiring should be done in 6 areas (working area, horizontal area, vertical trunk area, management area, equipment area, construction area) or 5 areas (working area, horizontal area, vertical trunk area, management area, equipment area) according to the requirements.
Engineering drawings generally use AutoCAD, Zhongwang CAD, Haochen CAD, Caxa, UG and other software. Among them, the most widely used is Aut.oCAD, mainly used for two-dimensional drawing, detailed drawing and design documents, has now become an internationally popular drawing tool.
Let me recommend one to you. There is a tool called visio in office2003, which is used for drawing vector diagrams. It is often used to draw two-dimensional floor plans, such as layout diagrams, top views, floor plans, connection diagrams, geolocation diagrams and flowcharts.
Download Baidu Know APP and experience it. Use Baidu Know APP to experience it immediately. There may be answers that others want to know in the lens of your mobile phone.
Connect the vertical trunk cable to the horizontal wiring subsystem of each floor. The equipment room subsystem connects various public equipment (such as computer hosts, digital program-controlled switches, various control systems, network interconnection equipment) to the main wiring rack.
Draw a comprehensive wiring diagram with visio: open the network diagram; on the "View" menu, click "Shape Data Window"; click the shape you want to add data; in the "Shape Data" window, select a data domain, and then type data for the domain; to move to the next attribute in the list, please Press the Enter key.
1. Ensure the integrity of the fire alarm system. Note: All control and signal cables in this system should use twisted pair shielded cables. This cable is a weak current cable and cannot be laid together with the solenoid valve power line. When laying with a wire groove, a separate wire groove must be used.
2. FromThe water cannon needs to put a 6-core cable and a 2-core video cable to the control box. From the central control room to the control box, a 6-core cable should be laid (2-core power cable 220v, 2-core signal cable, 2-core 24V power cable, and some controllers are 220v). That should be all.
3. The second-generation intelligent fire water cannon of Lianzong Fire Technology has also developed a remote control mode. In this mode, the operator can directly adjust the fire water cannon mouth up and down, left and right according to the symbols marked on the remote control to carry out the fire extinguishing procedure.
4. Water cannon to fire alarm host: SYV-75-5 (video cable). ( When the water cannon does not have video, there is no need to set up video and remote control lines, and the system does not have remote control function) (6) Fire alarm host to the pump room: RVV4x5 (start pump line, start pump feedback line).
5. Intelligent firefighters are not afraid of the operation method of the linkage control host. For military patrol shops, the linkage host can operate each water cannon, and each water cannon has a unique address in the linkage host. If you select the corresponding address, you can accurately operate each water cannon.
1. Draw a comprehensive wiring diagram with visio: open the network diagram; on the "View" menu, click "Shape Data Window"; click the shape you want to add data; in the "Shape Data" window, select a data domain, and then type the data for the domain; move to the next genus in the list Sex, please press Enter.
2. Open the Visio software.Click "File" - "New" - "Flowchart" and select "Basic Flowchart". Draw the process node. Drag the "shape" required for drawing the flowchart to the drawing area. Draw the process line. Select "Connection Cable Tool" to draw the connection. Identify the direction of the process.
3. The system diagram should be arranged according to the information points of each floor, and the management room of each building should be ten floors per seven floors. The comprehensive wiring of housing comprehensive design and wiring of each floor of the building construction drawing or system plan to understand the separate comprehensive wiring drawing.
4. In the blank space or folder on the desktop, click the right mouse button, and then select the new VISIO drawing. After creating a new one, we can modify the name, and then double-click the newly created document to open it. IT CAN BE SEEN THAT VISIO SOFTWARE PROVIDES A LOT OF TEMPLATES. WE CAN CHOOSE THE APPROPRIATE TEMPLATE ACCORDING TO OUR NEEDS, AND THEN CLICK THE CREATE BUTTON.
5. Next, we adjust the thickness of the lines, select all with ctrl+A, find the tool to adjust the thin bar in the toolbar above the workspace, and select the size that suits you. Such a basic organizational chart has been established.
6. Open the Visio software and import the image material. Click the picture, and then click the width and height in the lower left corner to pop up the size and position dialog box. Set the width and height. Accurately adjust the spacing of the pictures.
Pharma supply chain HS code checks
author: 2024-12-24 00:03HS code-based trade route profitability
author: 2024-12-23 23:55Refined metals HS code references
author: 2024-12-23 22:36Real-time supply chain financing insights
author: 2024-12-23 22:07Polymer resins HS code verification
author: 2024-12-23 21:52How to ensure data-driven export strategies
author: 2024-12-23 23:53Trade data for pharmaceutical imports
author: 2024-12-23 23:17Precious metals HS code alignment
author: 2024-12-23 22:58Real-time import export alerts
author: 2024-12-23 22:35HS code-based compliance cost reduction
author: 2024-12-23 22:33324.99MB
Check635.57MB
Check625.48MB
Check923.43MB
Check766.19MB
Check829.91MB
Check574.33MB
Check414.91MB
Check269.27MB
Check983.39MB
Check769.76MB
Check627.84MB
Check414.24MB
Check864.34MB
Check951.42MB
Check718.54MB
Check947.92MB
Check217.23MB
Check345.77MB
Check383.27MB
Check673.42MB
Check933.17MB
Check183.68MB
Check566.34MB
Check282.82MB
Check536.37MB
Check142.97MB
Check551.86MB
Check794.82MB
Check267.13MB
Check726.37MB
Check493.77MB
Check273.11MB
Check538.16MB
Check572.93MB
Check233.69MB
CheckScan to install
HS code-based forecasting for raw materials to discover more
Netizen comments More
890 Trade data-driven inventory optimization
2024-12-23 23:42 recommend
1687 Global trade data pipelines
2024-12-23 23:05 recommend
2070 How to manage cross-border complexity
2024-12-23 22:44 recommend
238 Real-time shipment inspection data
2024-12-23 22:37 recommend
1777 HS code analytics for import quotas
2024-12-23 21:54 recommend